Ask the Experts

Have a question about our timber products, or want to know more about our processes?

Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.

Main content

Product Blog

Select Category:

CRANE MAT PAD PART 4

Here is a follow up photo of the LR1600 Liebherr 660ton lifting capacity Crawler Crane sitting on Industrial Timber Products mats. The mats are 2 levels thick throughout the site. The curved over-pass beams are arriving on site for assembly. The over-pass will be lifted...

Rail Tie Special Wedges

How do you install a rail on a sloped surface? This special Rail Wedge is being used in a large tunnel (which will hold water after construction, it is a penstock) where a rail line is being installed up the middle to remove the...

Timber Stop Logs with Special U-Bolts

Timber Stop Logs, Douglas Fir Select Structural for maximum strength, 12" x 14" x 14' long, for a small dam on the Trent Severn Waterway in Ontario. These Stop Logs feature a U bolt design for easy placement and pick-up. A simple hand placement...

Crane Mat Pad at Vancouver Terminal Part 3

This picture shows the completely assembled Crawler Crane on the large Crane Mat pad which was provided by Industrial Timber Products. The Crawler Crane will be able to access all parts of the site because of the double decked Crane Mat Pad. LR1600 Liebherr 660ton...

Hardwood Blocking for Heavy Lifts

We provide Hardwood Blocking to various industries, in this case a major Rail Company, for blocking of heavy machinery in their shop. Timber blocks don't "slip" like a steel block would (steel on steel is a slippery mess).

Excavator on Crane Mats doing River Reclamation work

Jim is doing River Reclamation work in a small creek leading in to a larger river. Many years ago the stream was diverted for an industrial facility, now removed, the creek is being put back in to it's natural habitat and added wet-land. His...

Crane Mat Pad at Vancouver Terminal Part 2

The crane parts have arrived and are being assembled on the Crane Mat pad we supplied at the Terminal. It took 36 B trains to transport the Crawler Crane. They are only half way through assembling. This is a 2 layer pad built with...

Crane Mat Pad at Vancouver Terminal

This large Crane Mat Pad at a Vancouver Terminal will support a large Crawler Crane and SPMT (traveling wheel wagons) for an overpass build taking place in early 2019. Those new mats look nice and clean now! They won't be clean for long. One...

Work Platform

Here is a temporary de-watering pump platform, simply 3 Access Mats pushed together on site with a simple plastic spill-dam around the edge. The two pumps, fuel, tools, spill kit and operator can stay out of the muck and everything can stay more or...

Maple Rub Rails for conveyor system

We have a good customer that builds custom made conveyor systems for sorting packages. For several years we have been supplying Pacific Coast Maple surfaced and urethaned and pre-drilled for application. This looks more like furniture on these industrial conveyors. Employees lean against the...

Robson Square Benches

We provided a customer with Custom Drilled and Manufactured Timbers for some bench replacements in Robson Square in Downtown Vancouver. We custom sized, drilled, countersunk, planed and prepared the pieces before treating. At the jobsite they removed the old rotten pieces and replaced with...

Heavy Stop Log Panels

Heavy Stop Log Panels for maintenance at this large spillway.

Spillway for maintenance

The panels fit in a slot and stack on top of each other, making a full panel 21' tall and 31' wide

Stop Log panel half...

Rail Crossing Panels

These Rail Crossing Panels are built specifically to fit between standard Canadian Rails and provide a quick deployment crossing for heavy equipment and traffic. A small crane can place and some lag bolts and ready to go. These are 7" thick x 50" wide,...

Timber Bridge 14′ x 30′ Heavy Duty

This is a 2 part 14' x 30' long Heavy Duty Bridge that has been purchased by a Utility Company and is being deployed for 6 months for access to a transmission line and then deployed in a different area for access to a...

Boring Machine – with Crane on ITP mats

Here is a great picture of our Crane Pads in action. You can see the Gwil Crane set up on Transition Mats under the front tires (to level the machine) and then 6' x 12' Crane Pads under the outriggers for ground support. These...

Flag Pole – feeling patriotic?

We have a friend in Nova Scotia, he is in the Lobster business, he builds masts and spars in his spare time. He built this traditional Flag Pole for his own yard from some nice Douglas Fir Clear Kiln Dried stock we sent him....

Rail Ties 8×8

These short length rail ties are going up coast. 8" x 8' x 56" in Hem/Fir rough green #1 and btr. Nice looking product.
Rail Ties

Crane Mats in stock, Brandon, Manitoba

We are now stocking Crane Mats in Brandon, Manitoba for our customers in middle and eastern Canada. We can deliver to your location, most places Saskatchewan east to Ontario with 1 to 2 days. Please contact us for a quotation delivered to your job...

Transition Ramps at Corra Linn Dam

Customer needed to access across Stop Log grates at the Corra Linn Dam site near Sorrento, BC, Canada. We built special transition mats or ramps and capped them with steel on the "toe" and also built special size mats to slide between the grates....

Stop Log Timbers, Temporary Dam

These 10" x 10" x 120" Douglas Fir Stop Log timbers, from Select Structural material, are for a dam near Thunder Bay in Ontario, Canada. They are for a one time deployment so don't require a lifting mechanism. This is really pretty material, no...

Our Chain of Custody certification aligns with your sustainable procurement policies

Click here to view

Your Products

You have no products in your quote list or cart.