Ask the Experts

Have a question about our timber products, or want to know more about our processes?

Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.

Main content

Product Blog

Select Category:

Pipeline Contractor in Chilliwack uses Mats

Industrial Timber supplied access mats and crane mats to our customer so they could access a difficult site across a farmer's field (and more) in Chilliwack, BC. The site was soft ground and the job was to pick up and re-mediate a pipeline. The pipe...

Industrial Timber Products at Work on Montreal Bridge Project

Composed of 10,000 pre-cast concrete products, hundreds of steel tub-girder segments, dozens of 1,000-ton footings and 450-ton steel pier caps, construction of the new Champlain Bridge in Montreal has called for some seriously heavy-duty lifting. Industrial Timber Products provided crane mats to meet the demands of this massive construction project.

Crane Mats on the Fort Hills Co-Gen Site

These 4' x 20' supplied by Industrial Timber Products were used to make a large lifting platform area for the Fort Hills Co-Gen facility. Many crane hours were used to build/construct the buildings and surrounding infrastructure and by "matting" the...

Why Industrial Timber Product’s mats?

CarlWood's mats are made with the best Douglas Fir and Hemlock to ensure that the mats withstand even the harshest conditions.

Industrial Timber Product's are designed for safety in the workplace. The bolts are countersunk on each side of the mat...

South Fraser Perimeter Road

The South Fraser Perimeter Road was a major highway project for Metro Vancouver. This new highway is a four lane expressway running alongside the Fraser River. It is helping to reduce the amount of truck traffic driving on municipal roads.

Industrial Timber Products provided mats...

Willband Creek

Anyone driving along Highway 11 in Abbotsford, BC will notice the extensive amount of reclamation work that was done to improve Willband Creek Park. Sumas Remediation Services made the storm water retention facilities larger to help prevent flooding in the Matsqui Prairie. It has...

Outrigger Pads in Yellow!

These Outrigger Pads are for a Concrete Pumping company locally in Vancouver. They will place a steel pad 24" x 48" x 1/2" in the middle of the outrigger. This spreads the point load sufficiently for very heavy lifts.

Our Chain of Custody certification aligns with your sustainable procurement policies

Click here to view