Heavy Stop Log Panels
Heavy Stop Log Panels for maintenance at this large spillway.
Spillway for maintenance
The panels fit in a slot and stack on top of each other, making a full panel 21' tall and 31' wide
Stop Log panel half...
Have a question about our timber products, or want to know more about our processes?
Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.
"*" indicates required fields
Heavy Stop Log Panels for maintenance at this large spillway.
Spillway for maintenance
The panels fit in a slot and stack on top of each other, making a full panel 21' tall and 31' wide
Stop Log panel half...
These Rail Crossing Panels are built specifically to fit between standard Canadian Rails and provide a quick deployment crossing for heavy equipment and traffic. A small crane can place and some lag bolts and ready to go. These are 7" thick x 50" wide,...
This is a 2 part 14' x 30' long Heavy Duty Bridge that has been purchased by a Utility Company and is being deployed for 6 months for access to a transmission line and then deployed in a different area for access to a...
Here is a great picture of our Crane Pads in action. You can see the Gwil Crane set up on Transition Mats under the front tires (to level the machine) and then 6' x 12' Crane Pads under the outriggers for ground support. These...
A customer in Northern BC needs some very large mats to put a very large crawler crane on. We can do that!
7' x 30' x 12" mats are monsters, with 6 rods and 4 daps/pick up points. You may be able to see...
We have a friend in Nova Scotia, he is in the Lobster business, he builds masts and spars in his spare time. He built this traditional Flag Pole for his own yard from some nice Douglas Fir Clear Kiln Dried stock we sent him....
These short length rail ties are going up coast. 8" x 8' x 56" in Hem/Fir rough green #1 and btr. Nice looking product.
Rail Ties
We are now stocking Crane Mats in Brandon, Manitoba for our customers in middle and eastern Canada. We can deliver to your location, most places Saskatchewan east to Ontario with 1 to 2 days. Please contact us for a quotation delivered to your job...
Customer needed to access across Stop Log grates at the Corra Linn Dam site near Sorrento, BC, Canada. We built special transition mats or ramps and capped them with steel on the "toe" and also built special size mats to slide between the grates....
These 10" x 10" x 120" Douglas Fir Stop Log timbers, from Select Structural material, are for a dam near Thunder Bay in Ontario, Canada. They are for a one time deployment so don't require a lifting mechanism. This is really pretty material, no...
These Stop Log Panels were built for a Wastewater Treatment facility in Maryland, USA. They are extreme use, holding back up to 14' of water (head). The steel H Beam was set into the timbers and through bolted. Steel lifting ears were installed near...
This project is using Access Mats to form a platform for a tunnelling sled. 96" diameter pipe will be tunnelled under the highway so that traffic is not disrupted during construction. A small bobcat digs out the dirt inside the "tunnel" and then the...
"*" indicates required fields