Timber Bridge 14′ x 30′ Heavy Duty

This is a 2 part 14′ x 30′ long Heavy Duty Bridge that has been purchased by a Utility Company and is being deployed for 6 months for access to a transmission line and then deployed in a different area for access to a gas line. The bridge had to be able to handle a serious amount of weight. This is rated BCFS L100 or about 98,000 kg. Abutments will be using lock blocks. 2 rods go through (14′) to secure the bridge from separating during use. A disappearing lifting plate (x 4) come out of the deck and are fastened by a Clevis for lifting the bridge. There is no trip hazard.

Clevis for lifting

Bridge on trailer
Bridge half installed

Our Chain of Custody certification aligns with your sustainable procurement policies

Click here to view

Your Products

You have no products in your quote list or cart.