![](https://www.industrialtimberproducts.com/wp-content/uploads/2020/06/2020-06-17-11.03.51-scaled-850x638.jpg)
Timber Bridges!
We had 2 bridges loaded out today. The left and right side of the bridge are all pre-assembled. On site the customer has their contractor build the abutment and then sits the 2 sides together and slides a bolt through both sections locking the bridge in place.
Left and Right side of the bridge on truck, ready for installation.
2 sides of the timber bridge loaded on truck for delivery