Pile driving rig on ITP Crane Mats
This Junttan PMX 22 pile driving rig is sitting on 4' x 20' Crane Mats from Industrial Timber Products. The unit weighs 65,000 kgs and is driving 20m long piles. Ground stability is an important aspect to this job.
Have a question about our timber products, or want to know more about our processes?
Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.
"*" indicates required fields
This Junttan PMX 22 pile driving rig is sitting on 4' x 20' Crane Mats from Industrial Timber Products. The unit weighs 65,000 kgs and is driving 20m long piles. Ground stability is an important aspect to this job.
We supplied this bridge to a local contractor who needs to access the back end of a Golf Course in Surrey. The golf course is doing a housing development. All vehicles, from cement trucks to excavators to plumbers and electricians will access the site...
These are Yellow Cedar Rail Crossing Posts, you have probably seen them with the crossed white signs with black writing. We still have lots of work to do to them, we pre-drill them, we tee-pee the tops so the water runs off and we...
These jack blocks are used between steel jacks and the steel car bodies and axles, to stop steel on steel contact. They get heavy use. The black handles have chain inside them. The end handles on the 6" x 8" Maple Blocks are so...
Check out this nice contoured dunnage, 36" diameter pipe saddles, 3 across on single sided dunnage (for the bottom of the truck deck) and for between the layers of pipe (double sided). This will ensure nothing rolls around on the freeway!Â
As this picture indicates the Rail Crossing Panels are underneath the train cars in this train yard. Machinery is already crossing the panels as they access the roadway and move machinery across the rail tracks. Nice graffiti on this rail car! Colourful at least!
Here is a follow up photo of the LR1600 Liebherr 660ton lifting capacity Crawler Crane sitting on Industrial Timber Products mats. The mats are 2 levels thick throughout the site. The curved over-pass beams are arriving on site for assembly. The over-pass will be lifted...
My Great-Uncle Robert (Bob) McGregor was the founder of Vancouver Sawmills with his wife my Great-Auntie Maebel, which operated between 6th and 7th Avenue (1111 East 7th Avenue), just downhill from Clark Drive. It occupied a City block. There were several other business involved,...
How do you install a rail on a sloped surface? This special Rail Wedge is being used in a large tunnel (which will hold water after construction, it is a penstock) where a rail line is being installed up the middle to remove the...
Timber Stop Logs, Douglas Fir Select Structural for maximum strength, 12" x 14" x 14' long, for a small dam on the Trent Severn Waterway in Ontario. These Stop Logs feature a U bolt design for easy placement and pick-up. A simple hand placement...
This picture shows the completely assembled Crawler Crane on the large Crane Mat pad which was provided by Industrial Timber Products. The Crawler Crane will be able to access all parts of the site because of the double decked Crane Mat Pad. LR1600 Liebherr 660ton...
Customer required 10' x 10' Timber Outrigger pads because they were working on soft sandy soil. By spreading the point load this pedestrian bridge was installed safely with no safety issues.