Air Bridge for crossing utility lines
This Air Bridge was delivered to a customer in the Pacific North West for a project where the contractor needed to cross an oil pipeline. The machinery will work across the line for 6 weeks then remove the bridge. This bridge was delivered in 5 pieces…. 2 sills 12″ x 24″ x 16′, 2 outside panels with curbs 12″ x 50″ x 16′ (plus curb) and a single middle mat for pedestrians (so they didn’t fall through!).
notice 5 pieces, 2 sills, 2 decks and a middle
ready to cross utilities like gas lines, oil lines, electrical cables etc.
Request a Quote
"*" indicates required fields