Product Blog

Select Category:

Crane Mats to Saskatchewan!

Several trucks of Industrial Timber Products signature Crane Mats are on the way to Saskatchewan for an infrastructure project. Our customers can count on us to have Crane Mats in stock and ready to go. Often Crane Mats are required in a hurry when...

North Vancouver Interchange

Here is Gwil's Crawler Crane sitting on Industrial Timber Products Crane Mats at the Mountain Highway Interchange Project in North Vancouver. They are lifting structural beams across Highway 1 to enable the building of the Keith Road Underpass. They close the Highway at night...

Tunnel Crossing Vancouver

Metro Vancouver is constructing a 21' diameter tunnel under Burrard Inlet which will container 3 water mains. The tunnel will be 1.1 km long and will be 30 metres below the bottom of Burrard Inlet. The shaft is 60 metres deep on the North...

Water Supply Tunnel – Crane Mats

A new 1 km water supply tunnel is being bored from North Vancouver to Burnaby underneath Burrard Inlet. There are large vertical shafts on each end. We have supplied Crane Mats and Timber Blocking for the project. Here are a few pictures:

Floating Mats for a dock demolition

When our customer needed to demolish a large dock they needed to come up with a solution for dropping concrete waste onto a floating platform. Floating swamp mats was a quick and efficient answer. They float and they can take a lot of abuse....

Temporary Dock!

Sometimes you need a place to dock the work boat! We supplied 4' wide x 30' long x 12" thick Crane Mats for both a ramp and the floating dock. Quick job!

Trestle Mats for Bridge Project

We supplied these Trestle Mats to create a temporary bridge beside the actual bridge under construction. The temporary bridge provided a safe driving surface for the crawler cranes, redi-mix trucks, and all ancillary vehicles. Once the construction was completed, the temporary bridge was dismantled...

Pile driving rig on ITP Crane Mats

This Junttan PMX 22 pile driving rig is sitting on 4' x 20' Crane Mats from Industrial Timber Products. The unit weighs 65,000 kgs and is driving 20m long piles. Ground stability is an important aspect to this job.

CRANE MAT PAD PART 4

Here is a follow up photo of the LR1600 Liebherr 660ton lifting capacity Crawler Crane sitting on Industrial Timber Products mats. The mats are 2 levels thick throughout the site. The curved over-pass beams are arriving on site for assembly. The over-pass will be lifted...

Crane Mat Pad at Vancouver Terminal Part 3

This picture shows the completely assembled Crawler Crane on the large Crane Mat pad which was provided by Industrial Timber Products. The Crawler Crane will be able to access all parts of the site because of the double decked Crane Mat Pad. LR1600 Liebherr 660ton...

Excavator on Crane Mats doing River Reclamation work

Jim is doing River Reclamation work in a small creek leading in to a larger river. Many years ago the stream was diverted for an industrial facility, now removed, the creek is being put back in to it's natural habitat and added wet-land. His...

Our Chain of Custody certification aligns with your sustainable procurement policies

Click here to view