Ask the Experts

Have a question about our timber products, or want to know more about our processes?

Use the form below to submit your question. It will be promptly reviewed and answered by our technical team.

Heavy Duty Bridges

A portable short-span timber bridge can be used for crossing rivers, creeks, riparian areas, swamps, and pipelines. Ideal for highway legal loads, CarlWood's engineered portable timber bridges are supplied in two pieces with the curbs completely installed for quick installation and minimum machine time on site. Sometimes these bridges are called "DITCH JUMPERS"!

Main content

Product
Installed Size (T × W × L)
Span
GVW Rating
Shipping Size (W × L)
Weight
Price
Min. Quantity
HD Bridge 14' x 20'
  • 12"
  • × 14'
  • × 20'
  • 30cm
  • × 4.3m
  • × 6.0m
18'
5.5m
90,680kg L100
  • 7'
  • × 20'
  • (× 2 pcs)
  • 2.1m
  • × 6.0m
  • (× 2 pcs)
3500kg(× 2)
$12,750.00
HD Bridge 14' x 24'
  • 12"
  • × 14'
  • × 24'
  • 30cm
  • × 4.3m
  • × 7.3m
22'
6.7m
68,040kg L75
  • 7'
  • × 24'
  • (× 2 pcs)
  • 2.1m
  • × 7.3m
  • (× 2 pcs)
4200kg(× 2)
$15,730.00
HD Bridge 14' x 26'
  • 16"
  • × 14'
  • × 26'
  • 40cm
  • × 4.3m
  • × 7.9m
24'
7.3m
68,040kg L75
  • 7'
  • × 26'
  • (× 2 pcs)
  • 2.1m
  • × 7.9m
  • (× 2 pcs)
6000kg(× 2)
$27,203.00
HD Bridge 14' x 30'
  • 16"
  • × 14'
  • × 30'
  • 40cm
  • × 4.3m
  • × 9.1m
28'
8.5m
68,040kg L75
  • 7'
  • × 30'
  • (× 2 pcs)
  • 2.1m
  • × 9.1m
  • (× 2 pcs)
7000kg(× 2)
$31,790.00

All products can be manufactured to custom sizes.

Every order is reviewed against current timber pricing to ensure best value.

Product Features:

  • Bridges are treated to CSA Standard Schedule 80 with CCA Treatment
  • Bridges are supplied as two - 7' wide sections which can be easily joined on site
  • Supplied as a 12" thick deck with 20" high timber curbs
  • Actual driving surface is 12'4" wide
  • Bridges comply with BCFS L75 Load Rating 68,000kg GVW. Some bridges comply with BCFS L100 Load Rating
  • Engineered stamped drawings are supplied with each bridge
  • Integral lifting hooks make installation quick and easy with a HIAB or Excavator
  • Some bridge models kept in stock for immediate deployment
  • Customer designs and installs their own abutment system (typically cement step lock-blocks)
  • Made from PEFC Certified BC Coastal second growth sustainable Hem/Fir and Douglas Fir timber

Optional Product Features:

  • Sacrificial 3" Floor can be attached where wear is a concern

successfully added to your order